Installation
This project was to develop and produce a 30 second film to be installed in the ceiling of 'The Shard' public lift.
The two panels represent two high res video panels installed in the roof of the elevator. As you pass from ground level to the top floor the film passes through the seasons.
The two panels represent two high res video panels installed in the roof of the elevator. As you pass from ground level to the top floor the film passes through the seasons.
Producer: Graham English and Co
Director: Jim Dawson
Animation and VFX: Alex Hindle and JIm Dawson
Music: London Symphony Orchestra
Sound Design: Jamie Finlay
Director: Jim Dawson
Animation and VFX: Alex Hindle and JIm Dawson
Music: London Symphony Orchestra
Sound Design: Jamie Finlay